Mining accommodation container construction process and precautions

Mining accommodation container construction process and precautions

(Summary description)Mining accommodation container is built, and the surrounding and partition wall foundations are leveled. It is easy to use reinforced concrete, which is relatively strong.

Mining accommodation container construction process and precautions

(Summary description)Mining accommodation container is built, and the surrounding and partition wall foundations are leveled. It is easy to use reinforced concrete, which is relatively strong.

Information

Mining accommodation container is built, and the surrounding and partition wall foundations are leveled. It is easy to use reinforced concrete, which is relatively strong. Then erect the pillars, connect the skeleton with horizontal beams, install the partitions, exterior wall panels and door and window frames; then lay the floor, then install a layer up, and then install the roof trusses and roof panels; install doors and windows, etc., pull the vertical support.

Mining accommodation container from China manufacturer

1. Construction process

Set-out - excavation of foundation groove - C15 concrete foundation ground beam and ground concrete cushion construction - ground beam installation - column installation - floor beam system installation - walkway system installation - exterior wall panel installation - - Window Installation - Door Installation - Canopy System Installation - Roof System Installation - Inner Partition Panel Installation - PVC Ceiling - Cleaning Site - Completion Acceptance

2. Construction requirements
1. Gray line stakeout: stakeout according to the location of the living area floor plan.
(1) Residential container components
The installation position of each component should meet the design requirements, and the position of the on-site welding parts should be accurate, without false welding and missing welding.
(2) paint
a. After on-site welding and the peeling of the primer during transportation, a layer of anti-rust paint should be repainted
b. The exposed parts of the components should be brushed with two layers of topcoat, and the paint should not be leaked, peeled, painted or rusted.
(3) Wall
a. The Mining accommodation container and the wall must be calibrated according to the layout plan. The corners and outside corners of the umbrella wall are sealed with angle aluminum. The connection between the boards is made of I-shaped aluminum. Consistent, neat and clean, the walls should be clean, the color should be consistent, the board seams should be neat, the nailing surface should be consistent, and there should be no staggered, and self-tapping bolts should be used for necessary parts.
b. According to the design drawings, indicate the position of the doors and windows of the container conference room, cut out the position of the door and window holes with a cutting machine, install the windows and doors according to the positions of the door and window holes, the windows are plastic steel windows, and then carry out the ceiling of the bottom layer.